Project Spec

Commencement date: December 2018

Completion date: December 2018

Labour: Two operatives for three weeks

Scope of Works

To refurbish several panels on multiple elevations.

To mask and protect all areas unaffected by damage.

Clean and prepare all deep scratches and dents for filling and priming.

Fill and prime all scratches and dents.

Remove excess filler and smoothen panel surface and apply topcoat in RAL1013 Oyster.

Method & Special Requirements

Cherry picker required to reach works at height.

Painting of panels to be completed once panels have been prepared, primed and repaired, painting technique is spraying.

IPAF ticket necessary due to use of Cherry Picker

Working against the odds

The remedial cladding work was particularly challenging for the Buckingham Coatings team. Not only was there a tight deadline to comply with the contractor’s programme but wet and cold weather conditions also had to be negotiated within the works schedule.

The site was an extension of the operating NHS hospital, so it was also crucial that Buckingham Coatings operatives carried out the work professionally and with minimal disruption to the hospital’s patients and staff.

Efficient cladding repair & paint respray

Several of the damaged panels were at height which made it necessary for our on-site team to use a cherry picker to access them.

All Buckingham Coatings operatives hold International Powered Access Federation (IPAF)  accreditations so the cladding remedial work was administered at the necessary heights safely and responsibly without any disturbance to the hospital’s day-to-day operations.

Trained in working at height using mobile access towers

It was necessary for us to use a scaffold tower for certain elements of the cladding panel repair and respray works.

We were aware that extra care was necessary as some of the panels had been damaged previously through contact with a scaffold tower. However, we were able to guarantee full confidence in our operational expertise.  Our operatives are fully trained on the use of this equipment and hold Prefabricated Access Suppliers’ & Manufacturers’ Association (PASMA) tickets as evidence they are fully trained.

A colour-matched cladding respray

While the damaged cladding panels were being repaired, the paint was prepared for an exact colour match of the existing building’s RAL1013 oyster colour.  The paint coating could then be applied to the repaired cladding panels by the on-site respray team.

A fast and effective cladding repair & respray job

Despite the challenging time-frame and adverse weather conditions, our team successfully completed the cladding remedial works to meet the planned contractor schedule.

The hospital extension’s cladding was suitably rescued with the necessary repair work and completed with a colour-matched paint applied to produce the high-quality coated finish to the final cladding.

As testimony to QEH calling Buckingham Coatings for this job, the works were carried out with the operational professionalism and to the high standard of safety and quality that is synonymous with the Buckingham Coatings name.

QEH was delighted with the final job and pleased to state that patient care was not affected by the works.

Contact us about improving your building’s cladding or signage

If you have any signage, cladding or facades that require cleaning, repairing or recoating then please contact us for information or a quote.

Tel: 01376 311597

or email: info@buckinghamcoatings.co.uk

Recent News

Check out some more of our most recent news:

Is your building winter-ready?

Is your building winter-ready? It’s July already! We’ve reached the second month of Summer, and now is the perfect time to be thinking about preparing your building ready for the

Victoria Square, Woking – Cladding Repair

Victoria Square, Woking - Cladding Repair & Colour Match Our client contacted us requesting multiple cladding panel repairs after selected areas receiving damage during the construction phase of the build.

COVID-19 Site Safety

COVID-19 Site Safety During this difficult time of a Worldwide pandemic, the UK is currently experiencing a public health emergency, and this is all down to the result of COVID-19. Everybody’s

NHS Blood & Transplant Facility, Barnsley

NHS Blood & Transplant Facility, Barnsley The NHS Blood & Transport Facility in Barnsley got in touch with Buckingham Coatings in hope that we could complete a repair to some

Is your Building on Brand?

Is your Building on Brand? Whether you’re driving through a busy city or walking down your local high street, everywhere you look you will see the results of financial investments

Interested in working with Buckingham Coatings on a project like the above? Get in touch today to discuss your requirements.

Contact Us