Vaclensa Limited – Bolton

Client contacted us requesting a repair and respray to the building before the tenant vacated. This job consisted of us having to repair damaged cladding panels and filling in holes that required attention, then respraying over repaired areas to cover any noticeable areas and draw attention off any imperfections.

Project Spec

Commencement date: January 2020

Completion date: January 2020

Labour: Two operatives for two days

Scope of Works

Repair and Respray Cladding Panel (Spectrum Grey Rock)

Method & Special Requirements

Panels was severely damaged and require expertise and materials to achieve the required finish.

Vaclensa Limited Repair and Respray

Due to the panels being severely damaged it meant that they required expertise to complete correctly and safely, it also meant that we needed specific materials to achieve the required finish for the job. We completed a colour match to ensure we would be able to get all colours looking identical so there would be no noticeable marks left and no imperfections on the building. Because it was a repair to damaged panels before the tenant vacated their building so required the job to be dealt with and fixed ASAP.

Colour Match

Completing a bespoke colour match is an essential to this, it comes as a natural talent to all of our dedicated colour technicians who complete this process by study of the eye. Due to being so confident by the judge of the eye we believe our judgements are 90% accurate. We match all colours within the RAL, British Standard and Pantone colour coding systems, for this particular job we used Spectrum Grey Rock KC100.

Contact us about improving your building’s cladding or signage

If you have any signage, cladding or facades that require cleaning, repairing or recoating then please contact us for information or a quote.

Tel: 01376 311597

or email: info@buckinghamcoatings.co.uk

Recent News

Check out some more of our most recent news:

Is your building winter-ready?

Is your building winter-ready? It’s July already! We’ve reached the second month of Summer, and now is the perfect time to be thinking about preparing your building ready for the

Victoria Square, Woking – Cladding Repair

Victoria Square, Woking - Cladding Repair & Colour Match Our client contacted us requesting multiple cladding panel repairs after selected areas receiving damage during the construction phase of the build.

COVID-19 Site Safety

COVID-19 Site Safety During this difficult time of a Worldwide pandemic, the UK is currently experiencing a public health emergency, and this is all down to the result of COVID-19. Everybody’s

NHS Blood & Transplant Facility, Barnsley

NHS Blood & Transplant Facility, Barnsley The NHS Blood & Transport Facility in Barnsley got in touch with Buckingham Coatings in hope that we could complete a repair to some

Is your Building on Brand?

Is your Building on Brand? Whether you’re driving through a busy city or walking down your local high street, everywhere you look you will see the results of financial investments

Interested in working with Buckingham Coatings on a project like the above? Get in touch today to discuss your requirements.

Contact Us